To the central content area

Industrial Waste clearance vehicles Management System and Operation of the supervision system

Absrtact
The environmental protection bureau flows to of of for the effective tracing management enterprise reject, carries on the enterprise reject by the Internet system to flow to the control,and union using the GPS immediate localization, the wireless communication and the GIS date inquiry demonstration, the development enterprise reject the elimination ships immediate supervisory system, effectively carries on the enterprise reject the elimination ships immediate monitoring, and the penetration cancels checks compared to exceptionally and so on the procedure, provides the examination unit to plan the correlation examination work, prevents abandons by Du. Therefore namely begins from 87 years to start on the satellite positioning immediate supervisory system correlation engineering research development, the system to grind draws up, the soft hardware environment and so on carries on the plan, and starts establishing of the entity system in 90 years, the vehicle machine are partial separately completes first batch of and the second batch of announcement row steward industry reject in 91 years in May and 92 years in October the elimination ships the vehicles namely should specification of the installment and so on, the first batch of announcement completes 249 vehicles to install the GPS immediate supervisory system, after the second batch then promotes the specification, also increases approximately 769 the elimination ships vehicles to bring into line with this supervisory system. Total approximately thousand, so massive monitor the vehicles, is solid is the domestic correlation technology application actual control work first hastens, also control work effective realization enterprise reject.
Keyword
Global System for Mobile Communications (GSM),Personal Digital Assistants (PDA),Automatic Vehicle Location System(AVLS),General Packet Radio Service(GPRS),Global Position System (GPS),Industrial waste
Open
top